K

kfm.co.ug

@kfm Tue, 10 Oct 2023 12:48:34

Heavy traffic along Kayunga-Mukono road following partial closure of Ssezibwa bridge

By Fred Muzale Heavy traffic flow is reported along the Kampala-Mukono road after the Uganda National Roads Authority (UNRA) diverted traffic from the cracked Ssezibwa Bridge. Over the weekend, UNRA blocked heavy vehicles from using the 70-year-old dilapidated Ssezibwa Bridge along the Kalagi-Kayunga Road. This was after the bridge located at the border between districts of Kayunga and Mukono developed cracks while a section on the Kayunga side caved in, posing a risk to road users, especially motorists. Accordingly, UNRA advised motorists from Jinja will use the 72km Kampala- Jinja Road or alternatively the (64km) Njeru –Kisoga –Mukono road. According to KFM’s Fred Muzale, only light vehicles limited to one lane are allowed to use the bridge. He says this […]

read more

Other Headlines